Common Construction Project Risks: Everything You Need to Know

The construction industry is tough and volatile. It has one of the highest business failure rates among all economic sectors. No construction project is completely risk-free. Unexpected delays, material shortages, and supply chain disruptions can happen at any time.

Project delays rank among the most common construction risks. Poorly written claims cause most construction disputes throughout North America. The risks go far beyond scheduling issues. Projects often face budget overruns, building code violations, and dangerous site accidents. On top of that, material shortages and price swings can hurt your schedules, costs, and profit margins.

This piece covers everything about construction project risks. You'll learn about different risk types at each project stage - from preconstruction to completion. We'll show you practical ways to spot, handle, and track these risks before they throw your projects off course.

Premier desktop and mobile apps

Discover why contractors worldwide are switching to Premier.


Understanding Risk in Construction Projects

Construction projects come with unique challenges. These challenges can throw timelines off track, make budgets spiral, and affect quality standards. You need to understand these risks to protect your profits and deliver successful projects.

What is a construction project risk?

A construction project risk puts your project at risk of potential losses. These losses could affect your timeline, budget, quality standards, or safety protocols. The risk might have positive or negative effects on your project goals. Construction risks are complex because each project is unique and brings its own challenges.

Manufacturing projects usually deal with labour and supply risks. Construction risks are different - they change constantly, and you can't predict them. Your project involves many stakeholders, different building materials, changing weather, heavy equipment, and dangerous tasks. This mix creates an environment where you need to watch carefully and manage risks before they become problems.

Why risk management matters

Construction risk management helps you spot, evaluate, and control factors that could affect your schedule, budget, quality, or safety. You can't eliminate all risks in construction - that's impossible. The key is to prepare for uncertainties and reduce their effect.

Risk management plays a crucial role for these reasons:

  • Financial protection: You can spot potential cost risks early and set aside money for unexpected expenses
  • Schedule adherence: Your projects stay on schedule and meet contract deadlines with proper risk management
  • Safety improvement: About 18% of construction workers worldwide say they've been hurt at work, but only 40% get safety training
  • Resource optimization: Good risk planning helps you avoid shortages and waste while improving project efficiency
  • Problem prevention: You save time and money by catching small issues before they turn into big problems

Projects without proper risk assessment often rely on risk managers to report issues. This creates endless cycles of delays and fixes. The Construction Management Association of America states that "project management is risk management and risk management is project management" - you can't have one without the other for success.

Types of risks in construction

Your construction projects face various risks throughout their lifecycle:

Safety risks: Construction remains one of the most dangerous industries. Workplace accidents lead to injuries, lower productivity, and possible legal issues. Workers face risks from falls, getting hit by objects, equipment failures, and exposure to dangerous materials.

Financial risks: Cost overruns, late payments, tight budgets, and sudden material price increases can hurt your project. Legal disputes in North America's construction industry cost $40 million per case on average - this is a big deal, as it means that legal issues pose serious financial risks.

Schedule risks: More than 70% of construction projects run late. Bad weather, material shortages, worker issues, permit problems, or poor management can all cause delays.

Design and technical risks: Wrong designs, poor planning, and technology problems often lead to expensive changes during construction. Arcadis reports that contract document errors rank as the second biggest reason for disputes worldwide.

Contract and legal risks: Poorly written documents often start disputes. In fact, "poorly drafted or incomplete and unsubstantiated claims" caused most construction disputes in North America during 2021.

External risks: You can't control bad weather, supply chain problems, or new regulations. However, you need plans ready for when these issues arise.

Only when we are willing to understand these risks and take action to manage them will your projects have a better chance of success despite construction's inevitable challenges.

Risks During Preconstruction Phase

Your project's foundation rests on the preconstruction phase. A wrong start can create problems throughout construction and derail even promising projects. Early issues need quick fixes before they grow into bigger problems.

Inaccurate cost estimates

Nearly 70% of construction projects exceed their original budget. This big number expresses how estimation errors can wreck your project's finances.

Bad estimates usually come from three main sources:

  • Inadequate data: Estimators need reliable historical information and accurate project specifications. They make educated guesses without solid data.
  • Human error: Mistakes in data entry or misreading requirements lead to expensive problems, even with advanced software.
  • Failure to account for contingencies: Construction projects never go as planned. Projects without financial buffers for surprises are bound to face budget issues.

What does this mean? Budget problems hurt more than just finances. Your win rates drop by about 30%. Projects you win see profit margins shrink by 3% when estimates are off. Contractors working with tight margins might not survive these hits.

Unclear project scope

A vague scope creates confusion and unmet expectations. Team members might not see how their work fits into the bigger picture. This leads to basic solutions instead of innovative ones.

Scope risk shows up in several ways:

  • Unclear goals (like just saying "improve customer experience")
  • Requirements without specifics
  • Contracts that leave room for different interpretations

Scope creep runs on unclear boundaries. Small changes might look harmless at first. Together, they blow up budgets, stretch timelines, and drain resources. You need a formal change request process. This helps you assess how changes affect your work, budget, and schedule.

Site condition surprises

About 75% of construction projects run into unexpected site conditions. These surprises often involve soil or organic materials you must remove, replace, or treat.

Site surprises often include:

  • Underground rock formations
  • Contaminated soil or groundwater
  • Unmarked utility lines
  • Hidden debris or buried structures

Contractors must follow contract rules when these issues pop up. Most contracts need quick notification and preserved site conditions for inspection. Take photos and write reports. This evidence supports your claims later.

Standard AIA documents usually have fair rules for unexpected conditions. The trend now pushes all site condition risks to contractors, whatever their role in picking the site. Contractors often pad their bids to cover possible problems.

Design flaws

Design mistakes that slip through preconstruction get pricey during actual construction. The whole team should review construction documents. This helps catch design flaws, unrealistic specs, or hard-to-find materials.

Your review needs a team of architects, engineers, subcontractors, and stakeholders. Each expert brings unique insights that others might miss. Working together helps spot problems before they turn into expensive fixes during construction.

Preconstruction gives you the best chance to spot, analyze, and fix problems early. Good risk management at this stage cuts costs, keeps schedules on track, makes work safer, and builds trust between clients and contractors.

Risks During Construction Phase

Your project faces fresh challenges that can derail even the best-laid plans once construction starts. Most of your budget gets spent during the construction phase, and this is when risks become real problems.

Schedule delays

Latest studies show that timeline extensions plague almost half of all projects. These delays create a ripple effect throughout your project that drives up costs and puts stress on client relationships.

Several factors keep causing these scheduling headaches:

  • Poor project management: Teams often miss their marks due to weak planning and communication gaps
  • Permitting and inspection issues: Work can grind to a halt while waiting for regulatory green lights
  • Supply chain disruptions: Missing materials and delivery snags throw timelines off track
  • Change orders: When clients request changes, designs need updates and new approvals
  • Weather events: Safety concerns during harsh weather can stop all work

Many people think ordering materials a day or two ahead still works. Reality paints a different picture. Supply chains today just need two to three weeks minimum lead time. Some warehouses report wait times stretching beyond six months.

Labor shortages

Construction faces its biggest workforce crisis ever. Projects across the country don't deal very well with a shortage of about 650,000 workers needed to stay on schedule. This worker deficit slows down completion in any discipline, from homes to highways to hospitals.

Associated Builders and Contractors says the industry must hire 546,000 extra workers above normal rates. Two main issues drive this problem:

Young people, women, and people of colour rarely choose construction careers. Plus, fewer immigrant trades workers now fill labour gaps than before.

Numbers paint a clear picture. Construction trades employed 6.2 million workers in 2022, 11% below 2007 levels and 2% less than pre-pandemic numbers. It also turns out that 92% of contractors struggle to fill jobs.

These worker shortages lead straight to project delays. About 45% of construction companies say their projects run late because they or their subcontractors lack enough workers.

Equipment breakdowns

Machine failures can throw everything off track, both literally and figuratively. A broken piece of equipment affects your whole schedule, raises costs, and might put workers at risk.

Equipment usually breaks down because:

  • Teams skip maintenance checks and inspections
  • Operators make mistakes or misuse machines
  • Tough conditions like dust and moisture take their toll

Smart companies protect themselves by setting up regular maintenance, training operators well, and creating clear breakdown response plans. Quick action matters when equipment fails: stop using it, check the problem, call for help, and fix it fast.

Material delivery issues

Getting materials on time has grown from a minor headache into a major threat to project schedules and profits. The American Institute of Architects reports that material problems have caused big delays for more than 70% of construction firms over the last several years.

Several factors create these shortages:

  • Production slowdowns from the pandemic
  • Shipping and logistics problems
  • Not enough workers throughout the supply chain
  • Global trade issues from political tensions
  • Production stops due to the weather
  • World demand is going through the roof

Waiting until the last minute to order materials doesn't cut it anymore. Experts say you should give suppliers a 90-day heads-up whenever possible. Some builders now buy everything up front and store it at supplier yards; this locks in both price and availability.

Your best bet might be to broaden your supplier network. Sticking with just one supplier makes you much more vulnerable when shortages hit.

Project Management and Planning Risks

Construction projects often fail because of breakdowns in management and planning. A survey by the Project Management Institute revealed that engineers consider inadequate planning as the main reason projects fail. These basic risks don't just add to problems; they multiply across your project.

Poor communication

The construction industry loses billions each year due to communication breakdowns. Research shows that 52% of all rework happens because of poor communication, which costs the industry $31.3 billion in labour and materials.

Your project faces these ripple effects from miscommunication:

  • Project delays: Workers might follow outdated plans when instructions lack clarity or design changes aren't shared quickly, which creates expensive setbacks
  • Budget blowouts: The numbers tell the story - projects with weak communication stay within budget only 48% of the time, while those with strong communication hit 76%
  • Safety hazards: High-stress environments become dangerous when safety protocols aren't clearly communicated
  • Reduced productivity: Bergman's Vice President explains, "The worst outcome with poor communication from a cost and schedule point of view is the fabrication and installation of the product in the incorrect spec, dimension, or finish.h"

Teams stay coordinated through clear channels and regular updates. Digital tools and simple communication forms help teams document changes quickly without getting tangled in red tape.

Inadequate planning

Engineers rank "the project was not adequately defined at the beginning" as their top risk factor. "A lack of clearly defined project goals and objectives" comes third, followed by "project planning done with insufficient data" in fifth place.

Bad planning shows up as:

  • Rushed preconstruction phases because of tight deadlines
  • Projects are starting too early due to financial pressure
  • Incomplete site evaluations and feasibility studies
  • Missing stakeholder input during crucial planning stages

An industry expert points out, "The most important key to a project's success may be planning. While project planners rarely know about all activities and resources needed...we need them to understand as much about project goals and objectives as possible before project launch".

Ineffective change control

No construction project follows its plan exactly. Success depends on reliable change management processes. Many organizations react to changes instead of planning for them.

Change management often fails because of:

  • Late change detection
  • Poor communication with project owners about changes
  • Misalignment between contractors and project owners before implementing changes
  • Missing documentation

One expert observes, "Many breakdowns in change management are really breakdowns in communication". Teams make decisions with outdated information when scope changes aren't communicated quickly, sometimes losing contractors' rights to relief.

Teams should build a culture of early and frequent communication with standard processes to report changes right away.

Lack of contingency plans

Projects become vulnerable to preventable disruptions without backup plans. Construction involves uncertainty, but too many professionals treat risk management as just another box to check rather than a strategic need.

Good contingency planning needs three elements:

  1. Risk identification and assessment: Look at every project aspect to find weak spots
  2. Contingency allowances: Set aside specific budget percentages for unexpected costs
  3. Response strategies: Plan specific actions for when identified risks become real

An industry publication states, "Making informed decisions through analytical insights can be the linchpin of a successful construction project". On top of that, qualitative risk analysis helps teams focus resources by separating minor risks from major threats.

A successful project needs careful planning for uncertainty while staying flexible enough to grab new opportunities.

Technical and Operational Risks

Technical problems often hide under the surface of construction projects. They pop up right when they'll get pricey. These risks might seem small at first, but they can grow faster into major disruptions.

Design coordination errors

Almost every construction project's contract documents show design coordination problems. These problems come from teams not working together enough and poor review processes. Teams run into conflicts when architects, structural engineers, and MEP groups work alone. Picture this - you build the walls only to find that ductwork crashes into structural beams. This happens all too often on job sites.

Australian studies show that design documentation errors make construction costs jump up, about 14% of contract value. The UK construction industry loses billions of pounds each year due to design errors and missing details.

Teams face several roadblocks in coordination:

  • Poor change management
  • Messy office procedures
  • Young engineers lack hands-on experience
  • Rush jobs during design phases

Research shows all but one of these firms skipped Building Information Modelling (BIM) to spot conflicts. BIM coordination cuts down expensive rework by a lot. Without good coordination tools, design errors between structural and mechanical works cause the biggest headaches. Problems between the structural and plumbing systems come next.

Technology integration issues

A survey found construction businesses waste 101 days each year because of old laptops, hardware or technology. Workers lose another 85 days yearly as they struggle with system integration problems.

Construction teams face these tech challenges:

  • Old software (25% of workers deal with this daily)
  • Integration problems (25%)
  • Software updates (22%)
  • Learning new system features (19%)
  • Slow processing (17%)
  • Cybersecurity worries (17%)

Here's something surprising - 17% of construction businesses hadn't updated their software in 2-3 years. Even worse, 6% hadn't added new software in five years or more. New tech often clashes with old systems. This creates problems with how things work and share data.

Cybersecurity is a huge risk. Attacks hit more than 343 million people in 2023 alone. This makes storing sensitive project data in cloud systems pretty risky.

Safety protocol failures

OSHA reports that construction accounts for one in five worker deaths in the U.S. The industry remains one of the most dangerous for workplace deaths, losing over a thousand workers yearly.

The "Fatal Four" cause most construction deaths - falls, getting hit by objects, electrocutions, and caught-in/between incidents. Falls alone killed 37% of construction workers in 2021.

Just one serious injury can cost hundreds of thousands in medical bills, workers' comp, legal fees, and lost work. Safety failures do more than hurt the wallet - they delay projects and damage company names.

Companies can prevent every single safety violation with proper planning. The core team focuses on regular hazard checks, good training, and strict rules about safety gear to cut risks. Top companies go further by building a real safety culture that keeps getting better.

Environmental and External Risks

Construction projects depend on many external factors beyond your control. Natural disasters and global political events require smart risk management strategies to handle effectively.

Weather disruptions

Extreme weather events pose a growing threat to construction schedules and budgets. Weather-related delays affect about 45% of construction projects worldwide and cost billions in lost revenue each year. Sites suffer damage from floods, high winds, and extreme temperatures that stop work and reduce material quality.

The construction industry faces special risks because properties at different completion stages stay exposed to the weather. Heat creates dangerous working conditions - California reports around 20,000 heat-related injuries. Strong winds make crane operations unsafe and create hazards for framework activities.

Current OSHA rules require temperature checks with specific action points. Safety measures start at 80°F, and workers must take 15-minute breaks every two hours when temperatures rise above 90°F.

Supply chain instability

Material shortages and delivery problems have grown from occasional issues into constant challenges. Construction material prices jumped 20% globally in 2023, while timber costs rose 50% in some areas.

The biggest problem starts with tier-2 and tier-3 suppliers that companies don't monitor closely. Small delays build up over time and turn into major disruptions.

Traditional "just-in-time" delivery doesn't work in today's market. Projects depend on exact delivery timing with small safety margins. This creates problems when transport issues, bad weather, or customs delays change expected dates.

Geopolitical events

Global politics play a bigger role in setting prices. The Russia-Ukraine war and Red Sea trade problems have made supply chains unpredictable. Construction companies must now rethink where they source materials.

Political decisions in host countries can cause financial losses for investors. This political risk drives up capital costs by adding a country risk premium. Project financing and material availability feel these effects.

Without doubt, these factors spread through the entire construction value chain and affect equity investors, lenders, construction firms, and governments.

Environmental regulation changes

The government's focus on sustainability leads to faster changes in environmental rules. The construction sector generates 37% of global emissions, which attracts more regulatory oversight.

Recent US administration changes have revolutionized environmental regulations. New executive orders tell agencies to remove environmental rules that might limit energy development.

These regulatory changes create both challenges and opportunities for construction companies. Businesses that rely on environmental permits, emissions credits, or renewable incentives need new strategies as regulations continue to evolve.

How to Manage Construction Project Risks

Good construction projects succeed because they handle risks before they become problems. You need a step-by-step approach to spot issues early, plan your responses, and stay ready for unexpected challenges.

Risk identification methods

You need to look at projects from different angles to spot risks effectively. Your project team and stakeholders should get together for brainstorming sessions to uncover hidden problems. These shared discussions work best when everyone focuses on finding risks instead of solving them right away.

Root cause analysis helps you understand what's really causing problems rather than just dealing with surface issues. This method works great when you need to understand risks that connect to each other.

Past experiences teach valuable lessons. Take time to study similar projects and learn what could go wrong with your current one. Problems tend to repeat themselves, so knowing previous challenges helps you prepare better.

Regular site visits and careful studies help you find specific project risks like safety issues and delivery problems. Teams can now record their findings right away thanks to cloud tools that make documentation quick and simple.

Risk response strategies

After finding risks, you need clear plans to deal with them. Construction teams usually pick from four main approaches:

  1. Avoid the risk - The best option is to remove the risk completely. You might need to use different building methods, materials, or sometimes step away from risky projects.
  2. Transfer the risk - You can move responsibility to others through contracts, insurance, or by hiring specialists. The risk stays, but someone else becomes responsible.
  3. Alleviate the risk - You can make problems less likely or reduce their impact. Safety rules, better planning, and extra time buffers help.
  4. Accept the risk - Small risks with low chances of happening might cost more to prevent than to fix. Make this choice carefully, not by accident.

Monitoring and control tools

Risk registers help you track each risk, how important it is, who owns it, and where things stand. Keep updating this document as your project moves forward.

A risk assessment matrix shows which risks need your attention first by comparing how likely they are to happen and their possible impact. Focus on risks that are both likely and harmful.

Team meetings about risks keep everyone on the same page and help spot new problems. Schedule these check-ins regularly throughout your project.

Using software for risk tracking

New construction management software lets teams work together and see updates immediately. These tools work better than spreadsheets because they automate tasks and improve accuracy.

Pick construction project management software that includes risk assessment templates, ways to control documents, and dashboards you can customize. The best systems work with your schedule and budget tools to show how risks affect your timeline and money.

Cloud tools work great for construction teams at different sites because everyone can access them online. Many systems now use AI to help predict problems before they happen.

Conclusion

Construction project risks can feel overwhelming at first glance. The industry faces major challenges on multiple fronts. Yet understanding and preparing for these risks puts you in a better position to handle them when they come up.

We've explored how risks show up during different project phases in this piece. Preconstruction risks like inaccurate estimates and scope issues can derail your project from day one. Schedule delays and labour shortages often throw timelines off track during construction. On top of that, project management breakdowns, technical errors, financial problems, and external factors can lead to project failure.

The construction industry's unpredictable nature just needs a well-laid-out approach to risk management. Successful teams spot potential issues early and develop response strategies before breaking ground instead of reacting to problems as they pop up. This forward-thinking mindset helps stop small challenges from becoming major crises.

Risk management that works involves three key parts: identification, response planning, and continuous monitoring. Your first step is to analyze your project using multiple identification methods, like brainstorming and historical analysis. Then decide whether to avoid, transfer, reduce, or accept each risk. The final step is to set up dependable monitoring systems that track risks throughout the project lifecycle.

Technology is now vital to construction risk management. Modern software solutions bring risk data together, automate tracking, and give immediate visibility across teams. These tools help turn risk management from a periodic checklist into an ongoing, shared process.

You can't eliminate all construction risks, but careful planning and systematic management can substantially reduce their effect. Project success often depends on how well you anticipate and prepare for potential problems. The strategies in this piece will give you the tools to deliver projects on time, within budget, and to your clients' quality standards.

Latest articles

[ Join our Premier Community ]

Trusted by global leaders

Join those who have put their trust in us

Broccolini LogoBurkentine LogoCenturion American LogoFortis Group LogoGuardian Construction LogoPariseault Builders LogoPevco LogoSampson Construction LogoBoydhomes LogoBroadway Builders LogoFieldgate Construction LogoHigley LogoLGE Designbuild LogoOne70 Group LogoOvation LogoPyramid Builders LogoSordoni LogoSrc Constructions LogoStreamline LogoSummit LogoVPAC Construction Group Logo