Construction Risk Management: Proven Methods to Prevent Project Failures
[ Blog ]

Construction Risk Management: Proven Methods to Prevent Project Failures

This complete guide shows you proven ways to prevent project failures through smart risk management. You'll find practical strategies to identify, assess, and control risks throughout your project's lifecycle.

Construction projects face a staggering 107 different types of risks. The 2023 Arcadis Global Construction Disputes Report reveals these risks create disputes that average $42.8 million and drag on for more than 13 months.

Risk management has become crucial as the construction sector tackles multiple challenges. Your construction projects need robust protective measures, especially since 85% of contractors can't find skilled workers and safety remains the top project risk.

This complete guide shows you proven ways to prevent project failures through smart risk management. You'll find practical strategies to identify, assess, and control risks throughout your project's lifecycle. The guide helps you protect your projects and team while hitting deadlines and staying profitable through financial safeguards and safety protocols.

Table of Contents
The Evolution of Risk Management in Construction Industry
Systematic Risk Identification Process
Data-Driven Risk Assessment for Construction Projects
Technology Tools for Construction Risk Management
Financial Risk Mitigation in Construction Projects
Environmental and Safety Risk Control Methods
Implementing a Risk Response Plan
Training Teams for Proactive Risk Management
Conclusion
The Evolution of Risk Management in Construction Industry
Systematic Risk Identification Process
Data-Driven Risk Assessment for Construction Projects
Technology Tools for Construction Risk Management
Financial Risk Mitigation in Construction Projects
Environmental and Safety Risk Control Methods
Implementing a Risk Response Plan
Training Teams for Proactive Risk Management
Conclusion

The Evolution of Risk Management in Construction Industry

Risk management in construction has seen major changes since 2000. Project managers used to rely on simple ranking methods to assess threats. The industry later started to get into risk relationships and specific project types.

Traditional vs. Modern Approaches

Traditional risk management relied on intuitive-subjective assessments we developed from expert assumptions. This approach had clear limitations:

  • Single-viewpoint evaluations that left out key stakeholders
  • A narrow focus on internal threats instead of external factors
  • Actions taken only after incidents happened
  • Too much dependence on insurance and risk transfer mechanisms

But modern construction risk management takes a more systematic approach. Research shows 90% of contractors handle risks differently compared to five years ago. Current methods put emphasis on:

  1. Enterprise-level risk assessment rather than looking at individual projects
  2. Working together with cost, time, quality, safety, and environmental management
  3. Looking at both threats and opportunities
  4. Using data analytics and AI to predict risks

Premier Construction Software's risk management module shows this development through live risk monitoring and automated alerts that spot issues before they affect project timelines.

Why Old Methods Fall Short Today

Old approaches to construction risk management don't deal very well with today's complex projects. The older methods assumed risks would stay the same and never change. This made managers feel falsely secure and ignored situation-specific risks.

Construction projects waste an average of $127 million for every $1 billion spent because of poor performance. Research also shows that standard risk identification tools have several problems:

  • They can't map risks across entire project lifecycles
  • There's little collaboration between disciplines
  • They depend too much on one person's experience
  • The risk assessment process shows bias

The construction industry has moved away from generic project management toward specialized approaches. Modern risk management now tackles specific challenges in:

  • Underground construction projects
  • Green buildings
  • Prefabricated structures
  • Small-scale developments

New information and communication technologies have changed how construction firms handle risks. We used to just rank risks by importance, but now we look at:

  • How risks connect to each other
  • Political and social factors
  • Environmental compliance
  • Supply chain dependencies
  • Cybersecurity threats

Recent studies show construction organizations should do more than use simple checklists and analyze contracts. Successful risk management needs:

  • Informed decision-making
  • Regular talks with stakeholders
  • Flexible engineering plans
  • Systems that monitor constantly
  • Connection with other management functions

The biggest problem with the traditional approach was its reactive nature. Modern construction needs to spot and fix risks before they happen. Companies now know risk management works best when it starts during planning, not after problems show up.

Systematic Risk Identification Process

Success in construction projects depends on systematic risk identification. Research proves that unidentified risks cannot be controlled, transferred, or managed effectively.

Brainstorming Sessions with Project Teams

Project teams should start detecting risks early through collaborative brainstorming. Team members offer unique views that help uncover potential issues in different project areas. Premier Construction Software's risk management module supports these sessions with digital collaboration tools to capture and organize team insights.

Your brainstorming sessions should focus on:

  • Project scope and constraints
  • Site conditions and environmental factors
  • Regulatory requirements
  • Resource availability
  • Technical challenges

Risk Breakdown Structure Development

The Risk Breakdown Structure (RBS) provides a hierarchical framework to organize potential risk sources. This systematic approach works like the Work Breakdown Structure but focuses on risk categorization.

You can use the RBS to:

  1. Map risks into logical categories
  2. Identify gaps in risk assessment
  3. Spot risk concentrations
  4. Determine total project risk exposure
  5. Create standardized risk reporting formats

Studies show that an RBS increases risk identification accuracy by offering a structured way to assess each project component. Upper RBS levels serve as prompt lists that guide risk identification workshops and interviews.

Checklist Method for Complete Coverage

Construction risk checklists verify final steps after the original risk identification. These tools catch common project risks that might go unnoticed. Your checklist needs:

  • Financial risks - cost overruns, payment disputes
  • Schedule risks - delays, disruptions
  • Technical risks - design flaws, material failures
  • External risks - regulatory changes, natural disasters

Research shows that updated risk checklists help preserve corporate knowledge. Teams should review these checklists at project start and regularly during construction.

Expert Interviews and External Consultations

External experts share valuable insights from their specialized experience. Construction safety experts analyze workplace hazards, assess OSHA compliance, and review fall protection systems. Their expertise adds value to:

  • Workplace hazard assessments
  • Safety protocol development
  • Accident prevention strategies
  • Regulatory compliance verification

Studies reveal construction projects waste $127 million for every $1 billion spent due to inadequate risk identification. Expert knowledge becomes significant early in the process.

Premier Construction Software makes systematic risk identification easier through automated tracking and immediate monitoring features. This digital approach helps teams spot emerging risks and implement mitigation measures quickly.

Note that risk identification sessions work best during the preconstruction phase. Regular review meetings throughout the project lifecycle help identify new risks as construction moves forward.

Construction risk management experts suggest looking at both internal and external risk factors. The identification process must cover:

  • Weather conditions
  • Regulatory requirements
  • Construction defects
  • Labor shortages
  • Subcontractor performance
  • Natural disasters

Research shows risk management fails when teams implement it sporadically. A continuous approach to risk identification throughout your project's duration yields better results.

Data-Driven Risk Assessment for Construction Projects

Risk assessment helps estimate how severe potential threats can be in construction projects. Projects without proper assessment might waste time on minor risks while missing the most important ones that just need immediate attention.

Quantitative Risk Analysis Techniques

Quantitative risk analysis turns project uncertainties into numbers. This data helps you determine cost and time contingencies for construction projects. Premier Construction Software's risk management module supports this process with advanced analytics tools that process vast amounts of project data.

The analysis includes these key components:

  • Monte Carlo simulations to model multiple risk scenarios
  • Probabilistic risk measurement methods
  • Statistical analysis of cost estimates
  • Schedule impact assessments

Research shows construction projects waste $127 million for every $1 billion spent because they lack proper risk measurement. Monte Carlo simulations let you run thousands of possible scenarios that provide a complete picture of potential outcomes.

Qualitative Risk Evaluation Methods

Qualitative assessment looks at risks using non-numerical metrics and focuses on probability and impact through expert judgment. This method works best as an original assessment tool.

The severity of any risk depends on three vital factors:

  1. Impact - the effect on project objectives
  2. Likelihood - probability of occurrence
  3. Precision - degree of current risk understanding

A five-level scale typically measures both impact and likelihood:

  • Very Low (1)
  • Low (2)
  • Medium (3)
  • High (4)
  • Very High (5)

The overall impact rating looks at the greatest effect across project aspects like cost, schedule, functionality, and quality. To name just one example, a risk that threatens to increase costs by 100% but barely affects other areas still gets a high severity rating.

Using Historical Data to Predict Future Risks

Historical data is the life-blood of accurate risk prediction. Past project records, operational performance metrics, and incident reports create a solid foundation to identify patterns and correlations.

Studies show that analyzing historical data helps in:

  • Spotting recurring issues across projects
  • Assessing how well past risk responses worked
  • Developing more accurate contingency plans
  • Refining risk assessment methods

Premier Construction Software makes this process easier by keeping complete project histories and automating data analysis for risk prediction. The platform's analytics capabilities help spot trends that might signal potential issues.

Time series analysis and regression methods let you measure relationships between various risk factors. Statistical tools also show the strength and direction of dependencies between project variables.

Data-driven risk assessment works better when you:

  1. Collect quality data from reliable sources
  2. Apply appropriate statistical methods
  3. Verify findings through expert review
  4. Update assessments regularly

Research shows risk assessment doesn't work when done sporadically. Your project lifecycle needs continuous monitoring and analysis.

Statistical analysis reveals that the average risk value in construction projects amounts to approximately 4-5% of the contract value. This information helps allocate appropriate risk reserves and develop targeted mitigation strategies.

Note that qualitative assessments can always be done and often require less time and resources than quantitative analysis. In spite of that, using both approaches provides the most complete risk evaluation strategy for construction projects.

Technology Tools for Construction Risk Management

Technology has revolutionized how construction companies manage their risks. Digital tools now give us precise ways to spot, evaluate, and handle project risks.

BIM for Risk Visualization and Prevention

Building Information Modeling (BIM) brings great value to risk management with its 3D modeling capabilities. BIM's visualization lets you:

  • Try design changes before building starts
  • Find potential clashes early
  • Check how changes affect structure and costs
  • Spot safety issues through virtual walkthroughs

BIM's data-rich environment helps predict future risks by analyzing each component's dimensions, quantities, costs, and warranty details. The system automatically spots design conflicts, which cuts down expensive fixes during construction. BIM's detailed visualization boosts safety risk management. Teams can spot unsafe conditions and job site hazards through 3D fly-throughs. Quick analysis and management of safety risks happen through shared features.

Cloud-Based Documentation Systems

Cloud storage creates a central hub for project documents. These platforms give you:

  1. Version control to track changes
  2. Role-based access controls
  3. Shared tools
  4. Automated approval workflows
  5. Secure data encryption

Premier Construction Software's cloud system keeps detailed project histories and makes document management smooth. This central approach helps track past projects and their profits, so risk management teams can analyze historical data better.

Teams can quickly access policies, plans, and reports through the platform's document features. Past projects can be reviewed quickly to make better decisions while creating risk management strategies.

Mobile Apps for Real-Time Risk Reporting

Mobile apps have changed how field data gets collected and reported. These tools provide:

  • Quick incident documentation
  • GPS-enabled time tracking
  • Biometric verification
  • Live project updates
  • Safety compliance monitoring

Studies show construction companies that use digital workforce solutions cut down office work by up to 80%. Mobile apps make risk documentation easier through:

  • Voice-to-text recording
  • Photo and video attachments
  • Custom checklists
  • Automated report generation
  • Live dashboard updates

Premier Construction Software's Risk Management Module

Premier Construction Software has created an advanced risk management module specifically for construction projects. The platform combines:

  • AI-powered analytics to predict risks
  • Custom approval workflows
  • Live operational visibility
  • Critical KPI monitoring
  • Risk alert systems

The software connects financial management, project execution, and field operations in one place. This setup allows detailed risk assessment across multiple projects and companies.

Premier's system automates approvals for:

  • AP invoicing
  • RFIs
  • Variations
  • Purchase orders
  • Subcontracts
  • Tasks
  • Submittals

Architects, clients, and subcontractors can work together through dedicated portals with guest access. This smooth communication reduces errors and makes projects run better.

AI capabilities make automation, flexibility, and cost control better. Custom reports with critical KPIs and risk alerts help drive profits while optimizing performance across projects.

Financial Risk Mitigation in Construction Projects

Financial risks are major threats to construction projects. A newer study, published in 82% of business failures shows cash flow problems cause most failures. Careful planning and taking action early can protect your projects from financial problems.

Cash Flow Management Strategies

Cash flow projection serves as a financial decision-making roadmap. Your construction project just needs enough cash to handle unexpected costs. Premier Construction Software's unified platform simplifies this process through:

  • Automated AP invoicing workflows
  • Live operational visibility
  • Critical KPI monitoring
  • Customizable reporting systems

Research shows that clear payment schedules with late payment penalties reduce cash flow disruptions. Strong credit practices are crucial too. Credit checks for new clients before work begins and regular monitoring throughout the project are essential.

Your project's success depends on accurate budget forecasts at each phase. You must track financial obligations from design and permitting to construction completion. Premier Construction Software's analytics tools help predict costs and allocate resources better across multiple projects.

Material Price Fluctuation Safeguards

Market volatility today requires smart approaches to material cost management. Supply chain disruptions and price spikes create unprecedented challenges for construction companies. These proven safeguards can protect against fluctuations:

  1. Early Material Procurement: Buy out needed materials early in the construction project
  2. Direct Purchasing: Build direct relationships with suppliers to reduce markup
  3. Storage Solutions: Secure warehouse space for storing materials until installation
  4. Alternative Suppliers: Find backup suppliers in neighboring regions
  5. Price Escalation Clauses: Add mutual adjustment provisions in contracts

Price escalation clauses should specify materials subject to adjustments. Changes should link to objective measurements like catalog prices or established market indices. These clauses are most effective when added during early contract negotiations, so upstream parties can plan for variations.

Contingency Budget Planning

A well-laid-out contingency budget protects against unforeseen expenses. Construction contingencies usually range from 5-10% of total project cost. Your contingency planning should cover:

  • Design modifications
  • Scope changes
  • Unknown site conditions
  • Regulatory compliance issues
  • Supply chain disruptions

Premier Construction Software's risk management module documents contingency usage thoroughly. The system provides quarterly reports of contingency spending and keeps all stakeholders informed.

Best results come from separating contingency into distinct categories. Owner's contingency covers scope changes or unknown conditions, while contractor's contingency handles construction-related issues. On top of that, it helps to keep a design contingency of 5-10% of overall construction costs for unexpected design requirements.

Premier Construction Software's integrated platform helps you track payment schedules, spot risky accounts, and keep healthy profit margins across projects. This makes smart financial risk management easier.

Note that contingency funds have specific purposes. They should address scope requirements or unknown conditions first. Good management prevents unnecessary losses while keeping your project flexible.

Environmental and Safety Risk Control Methods

Bad weather and environmental risks pose big challenges for construction projects. Weather events delay 45% of construction projects worldwide. This leads to billions of dollars in extra costs.

Weather-Related Risk Planning

Temperature changes directly affect how well workers perform their jobs. Research shows worker productivity drops by 57% when temperatures rise just 1°C above 28°C. The best ways to handle these challenges are:

  • Advanced weather tracking systems with hyper-local forecasts
  • Flexible schedules that change with weather conditions
  • Rules for storing materials in bad weather
  • Quick response plans for extreme weather

Premier Construction Software's risk management module helps weather planning with instant alerts and automatic schedule changes. This digital solution helps keep projects moving while reducing weather disruptions.

Site-Specific Safety Protocols

Construction Environmental Management Plans (CEMPs) provide a solid foundation for site safety. These plans spell out how to:

  1. Handle contaminated waste
  2. Keep dust under control in dry weather
  3. Stop silt from spreading during floods
  4. Control vehicle movement
  5. Handle pollution incidents

Studies show construction makes up more than 46% of all deadly falls, slips, and trips. Your safety protocols should cover:

  • Required protective gear
  • How to evacuate in emergencies
  • Where first aid stations are
  • Ways to communicate
  • Rules for using equipment

Premier Construction Software makes safety protocols easier with digital checklists and quick incident reports. Teams can document safety issues and alert stakeholders right away using mobile devices.

Environmental Compliance Strategies

Environmental rules require careful attention to stop pollution and manage waste. Construction work often stirs up existing pollutants or creates new environmental hazards. Good compliance plans should have:

  • Full risk checks of suppliers in dangerous areas
  • Insurance against weather-related supply problems
  • Regular checks of groundwater
  • Safe storage of dangerous materials
  • Systems to keep dust down

Research shows construction projects must tackle several environmental issues:

  • Ways to handle waste
  • Steps to control air quality
  • Methods to save water
  • Use of green materials
  • Techniques to cut pollution

Your environmental plan must have emergency response steps. This means setting up ways to communicate, evacuate, and reduce environmental damage.

Premier’s construction management software keeps detailed records of environmental compliance work. The platform tracks permits, inspections, and rules across projects automatically.

Climate change brings more problems through supply disruptions and damage to infrastructure. Your strategies should look at:

  • Late material deliveries
  • Problems getting equipment
  • Weak spots in infrastructure
  • Worker safety in bad weather
  • Plans to help communities adapt

Regular environmental checks help keep your compliance strategies current with changing rules. Good planning and control methods will help you manage environmental and safety risks while keeping projects efficient.

Implementing a Risk Response Plan

A risk response plan is a vital step in construction risk management. It turns theoretical strategies into practical actions. A well-executed plan protects your project from potential threats and maximizes opportunities.

Developing Actionable Contingency Plans

Contingency planning is the foundation of effective risk response. It acts as a safety net for unexpected events that could derail your project. Studies show construction contingencies usually range from 5% to 10% of the total project cost.

Here's how to create resilient contingency plans:

  1. Identify hazards during preconstruction
  2. Devise response strategies for each risk
  3. Develop backup plans for accepted risks

These common construction risks need specific contingencies:

  • Materials not delivered: Pre-order specialized materials or create alternative designs
  • Lack of qualified workers: Set up labor camps or source workers from other regions
  • Unavailable equipment: Order critical machinery during the design phase
  • Staff illness: Secure insurance coverage for the core team
  • IT failures: Set up backup systems and uninterrupted power sources
  • Power or water outages: Install standby generators and duplicate supply lines

Premier Construction Software's risk management module makes contingency planning easier through simplified processes and live operational visibility. This digital approach helps track contingency usage and keeps all stakeholders informed.

Note that your contingency budget works like insurance. Your construction team can handle unexpected issues efficiently and in a planned way. The funds should be allocated across different risk categories:

  • Owner's contingency: Covers scope changes and unknown conditions
  • Contractor's contingency: Addresses construction-related issues
  • Design contingency: Handles unforeseen design requirements (5-10% of construction costs)

Testing Risk Response Effectiveness

Testing your risk response strategies is essential for success. You can spot weaknesses and improve your approach. These steps help test your plans' effectiveness:

  1. Conduct drills and simulation exercises
  2. Analyze feedback from testing phases
  3. Monitor the efficiency of implemented strategies
  4. Review and revise plans based on new information

Smaller companies often test plans through direct execution. Larger teams benefit from structured approaches, especially in areas with mixed dependencies.

Premier Construction Software makes risk response testing smoother through its integrated platform. The system's analytics help spot trends and potential issues, so you can quickly adjust your strategies.

Your testing should focus on:

  • Plan's practicality in real-life scenarios
  • Team's familiarity with response procedures
  • Communication effectiveness during simulated crises
  • Resource allocation efficiency
  • Time needed for plan execution

Regular testing eliminates flaws in your risk response strategies. Your workers become familiar with emergency procedures and can act quickly during actual crises.

Continuous Improvement of Risk Strategies

Construction risk management needs constant refinement. Projects evolve, and so do their risks. Your risk strategies stay effective when you:

  1. Conduct regular risk reviews throughout the project lifecycle
  2. Update risk assessments based on new information
  3. Learn from past projects
  4. Stay informed about industry best practices
  5. Adapt to changing market conditions and regulations

Premier Construction Software helps with continuous improvement through its data analytics. The platform helps you learn about risk management strategy effectiveness and make targeted improvements.

Studies show risk management doesn't work well when it's done sporadically. You need a continuous, thoughtful approach to risk identification and response throughout your project.

These steps streamline ongoing improvements:

  • Schedule periodic risk management reviews
  • Create a feedback loop for lessons learned
  • Adjust your framework for emerging risks (e.g., new technologies, geopolitical changes)
  • Let stakeholders participate in regular risk planning sessions
  • Use historical data to refine future risk predictions

Note that your risk response plan is your last defense against project threats. Have contingencies ready instead of creating them when risks appear.

By doing this and using advanced tools like Premier Construction Software, you'll build a resilient risk management approach. This proactive stance protects your projects, maintains profitability, and delivers successful outcomes in the ever-changing world of construction.

Training Teams for Proactive Risk Management

Effective construction risk management needs proper training as its life-blood. Studies reveal that employees with full risk management training spot potential hazards faster and respond better to emergencies.

Risk Awareness Programs

Your construction team needs ongoing training beyond simple certifications. Research indicates that construction workers who receive regular safety education show higher awareness of how their actions affect themselves and others. Premier Construction Software's risk management module aids this through digital training tools and progress tracking.

Essential components of risk awareness training include:

  • Daily planning meetings and toolbox talks
  • On-the-job coaching sessions
  • Regular safety updates
  • Incident response drills
  • Performance feedback loops

Studies highlight that aging workforce segments have valuable knowledge about avoiding incidents yet often become overconfident. First-hand experience shows that newer hires need extensive training as veteran workers retire. Premier Construction Software's documentation system helps preserve vital risk management knowledge for future teams.

Simulation Exercises for Common Risk Scenarios

Construction teams learn better with hands-on practice managing potential risks. Data shows that simulation exercises reduce administrative time by up to 80%. Your simulation program should address:

  1. Equipment operation hazards
  2. Weather-related emergencies
  3. Supply chain disruptions
  4. Safety protocol breaches
  5. Environmental incidents

Field testing shows that table-top exercises work well as starting points. These well-laid-out discussions help teams:

  • Get into pre-incident information sharing
  • Practice incident response procedures
  • Test post-incident recovery plans
  • Assess communication protocols
  • Identify gaps in current strategies

Research emphasizes that construction workers face six to seven times higher risk of serious incidents than other industries. Regular simulations help your team develop muscle memory for proper emergency responses.

Creating a Risk-Conscious Culture

A risk-aware culture starts at the leadership level. Studies show that organizations with strong safety cultures experience fewer accidents and higher productivity. Premier Construction Software aids this through:

  • Automated safety compliance tracking
  • Immediate incident reporting
  • Performance analytics dashboards
  • Team communication tools
  • Risk assessment templates

Practical steps to develop risk consciousness include:

  • Rewarding active risk reporting
  • Encouraging open communication
  • Implementing kaizen principles
  • Establishing clear accountability
  • Maintaining consistent messaging

Data confirms that workers who participate in risk management tap into their collective expertise and create more effective mitigation strategies. On top of that, research shows periodic training refreshers, at minimum annually, help maintain risk awareness.

Your risk-conscious culture should catch leading indicators first. Think about offering incentives for:

  • Reporting near misses
  • Identifying unsafe conditions
  • Pausing work to address hazards
  • Suggesting safety improvements
  • Participating in risk assessments

Evidence indicates that construction teams with positive safety cultures see risk management as part of their job rather than an extra task. Premier Construction Software's integrated platform helps track these cultural indicators and measure improvement over time.

Note that developing strong risk awareness takes time. Your team needs consistent communication and regular participation. Risk concepts should be available and practical, showing their application to daily construction activities.

Conclusion

Managing construction risks requires a close eye on multiple connected aspects. Your project's success relies on systematic identification, analytical insights, and tech-powered solutions working together.

Premier Construction Software makes all these significant elements work smoothly with its complete risk management features. Construction teams can spot issues early and prevent them from becoming pricey problems thanks to the platform's automated workflows, live monitoring, and advanced analytics.

Today's construction projects need solid protection in a variety of areas:

  • Systematic risk identification
  • Analytical assessment methods
  • Financial safeguards
  • Environmental protocols
  • Safety management systems
  • Team training programs

Teams that put these strategies into action see fewer disputes, lower costs, and better project results. On top of that, companies using digital tools save up to 80% of administrative time while keeping better control of risks.

Take a good look at your current risk management approach. Find any gaps in how you identify, assess, or respond to risks. Think about which tech tools could make your strategy stronger. Being proactive with risk management takes consistent effort and regular updates to handle new challenges.

Premier Construction Software gives you the tools like construction accounting software and financial management construction software to protect your projects and keep them profitable. Book a demo today and see how our risk management solutions can help your construction business grow.

Latest articles

[ Join our Premier Community ]

Trusted by global leaders

Join those who have put their trust in us

Broccolini LogoBurkentine LogoCenturion American LogoFortis Group LogoGuardian Construction LogoOnec LogoPariseault Builders LogoPevco LogoSampson Construction Logo
Broccolini LogoBurkentine LogoCenturion American LogoFortis Group LogoGuardian Construction LogoOnec LogoPariseault Builders LogoPevco LogoSampson Construction Logo
Broccolini LogoBurkentine LogoCenturion American LogoFortis Group LogoGuardian Construction LogoOnec LogoPariseault Builders LogoPevco LogoSampson Construction Logo